Kitchen Remodel Timeline: How Long Does a Kitchen Remodel Take?

About the author
Angel Sandoval is the owner and lead craftsman at Majestic Cabinets LLC, bringing over two decades of hands-on experience in custom cabinetry and residential construction to every project in the Las Vegas Valley.
Kitchen remodeling typically takes 4 to 12 weeks, depending on the project’s scope.
A minor kitchen remodel, such as replacing the cabinets, could take a few weeks once the process starts. More extensive kitchen remodeling could take a few months; this could include restructuring the kitchen, relocating plumbing, changing electrical wiring, installing new floors, or adding new fixtures.
Kitchen remodeling involves many aspects. You will need to remove and reinstall the cabinets. You may also need plumbing and electrical work. Other work may include new cabinets, countertops, backsplash, floors, lighting, appliances, painting, and hardware.
This all takes time, but you will still need to figure out how you will cook while the work is being done.
Majestic Cabinets does home remodeling in Las Vegas, Henderson, Summerlin, and North Las Vegas. We provide a kitchen remodeling timeline during our discussions.
Our kitchen remodeling services can help bring your new kitchen together with a clear plan from the start.
How Long Does a Kitchen Remodel Take?
There isn’t one timeline that applies to all kitchens.
A less complex renovation could take a couple of weeks once the process starts. A complete kitchen renovation will take months from the start of design to the completion of installation.
As revealed in the 2026 U.S. Houzz & Home Study, the average planning time is 9.5 months while the average construction time is 5.8 months. That doesn’t mean your kitchen renovation will take 5.8 months.
The construction team isn’t the only factor in your timeline.
Exploring kitchen cabinet refacing ideas can help you decide whether a smaller update makes more sense for your kitchen.
A Typical Kitchen Remodel Timeline
1. Planning and Design: Several Weeks to Several Months
You will need to plan before you start demolition.
Knowing the timeline for replacing kitchen cabinets can help you decide whether your project needs a cosmetic update or a more complete remodel.
Here, you measure the kitchen, select cabinet styles and finishes, and plan storage, layout, and budget.
We have seen homeowners come in with a particular style in mind, but change their minds after viewing cabinet samples next to their floor and countertop selections. This is very common. It is always easy to choose before installation.
2. Ordering Cabinets and Materials: Several Weeks
After you’ve finalized the design, you can order your cabinets and other materials.
The installation date depends on material availability, so it’s best to decide on appliances, counters, sinks, faucets, hardware, lighting, and flooring early.
For instance, if an appliance affects your cabinet sizes, don’t have your cabinets installed based on assumptions.
3. Demolition and Removal: A Few Days
Once preparations are complete, it’s time to remove the old kitchen.
Demolition in a small kitchen takes about a couple of days, but larger projects can take longer, especially when you need to change the floor, walls, plumbing, or electrical work.
This is usually when homeowners discover everything hidden in those cabinets.
We recommend creating a temporary kitchen before demolition.
4. Plumbing, Electrical, and Structural Work: Several Days to a Few Weeks
This task is not difficult if your layout is staying the same.
This project gets much more complicated if you move your sink, dishwasher, range, refrigerator, or island.
Moving an island, for instance, can affect electrical connections, flooring, lighting, walkways, and appliance placement.
5. Walls and Flooring: Several Days to a Week or More
After the prep work is done, the kitchen starts to resemble a kitchen. Really.
You can do wall repairs and paint, and install or refinish the flooring.
6. Cabinet Installation: Usually a Few Days
Once the cabinets arrive and the space is ready, installation can often be completed within several days, depending on the kitchen’s size and complexity.
Cabinet installation is not simply putting boxes against a wall. Cabinets need to be positioned, leveled, secured, and coordinated with appliances, walls, plumbing, and countertops.
76% of renovating homeowners include built-in features, with pantry cabinets the most popular at 47%. Storage remains a major priority.
7. Countertops and Backsplash: Several Days
Once the cabinets are installed, you can proceed to measure and make the countertops.
That is why countertops are usually made after the cabinets are installed. Proper cabinet placement ensures accurate measurements.
Once the countertops are installed, you can start installing the backsplash.
85% of homeowners who renovate change their backsplashes. The backsplash is the finishing touch and a major part of any remodeling project.
8. Appliances, Hardware, Lighting, and Final Details: A Few Days
Near the end, the kitchen starts coming together quickly. Install appliances, add cabinet hardware, finish lighting and plumbing, and complete touch-ups.
This is also when small details get noticed: a drawer that needs adjustment, a cabinet door that needs alignment, or trim that needs attention. They may seem minor, but they are part of a proper finish.
What Can Delay a Kitchen Remodel?
Even a well-planned remodel can run into surprises.
Common causes include:
- Materials arriving late
- Changes after construction begins
- Hidden plumbing or electrical problems
- Inspection requirements
- Appliance delivery issues
- Damaged materials needing replacement
- Unexpected structural repairs
- Changes to the original scope
One common issue we see is a project changing halfway through. A homeowner may start with new cabinets and countertops, then decide to move an appliance, add lighting, change flooring, or open a wall.
Those changes may be worthwhile, but they can extend the timeline. Decide as much as possible before demolition starts.
How Can You Make a Kitchen Remodel Go Faster?
You cannot control everything, but you can make the process smoother.
Finalize the design before construction begins. Order major materials early. Confirm appliance dimensions. Decide on cabinet finishes and hardware before installation day.
Most importantly, work with professionals who communicate clearly about what happens next.
Does a Kitchen Remodel Always Take Months?
No.
If you are replacing cabinets without changing the layout, the project can be much quicker than a full gut renovation.
For example, a kitchen with sound flooring, working plumbing, a good electrical setup, and a layout the homeowner likes may only need new cabinets, better storage, and countertops. That is very different from removing walls, moving plumbing, rewiring the room, and changing appliance locations.
The scope matters more than the label “kitchen remodel.”
What Should You Do Before Your Remodel Starts?
Think about how you actually use the kitchen, not just how you want it to look in photos.
Where do you keep pots? Do you need more drawers? Is the pantry always overflowing? Does someone make coffee every morning? Are appliances sitting on the counter because there is nowhere else to put them?
These everyday questions can lead to better cabinet decisions.
Homeowners are not remodeling only because they want a prettier kitchen. They want kitchens that work better.
Plan Your Kitchen Remodel With Majestic Cabinets
The key is to make decisions early, order materials on time, and leave room for the unexpected.
At Majestic Cabinets, we help homeowners in Las Vegas, Henderson, Summerlin, and North Las Vegas create cabinetry that fits how they actually use their kitchens.
If you are planning a remodel, start with the layout, storage, cabinet style, and overall scope.
Get a free in-home estimate to talk through your kitchen cabinet project.
Cabinet Refinishing Specialists
Make Your Old Cabinets Look New Again
If your cabinets are still structurally sound but look worn or outdated, refinishing is the smartest move. Most jobs in Las Vegas are completed within a few days — we keep the mess to a minimum the whole time.
People Also Ask
How long does a kitchen remodel generally take?
A kitchen remodel might take a few weeks for a small remodel or a few months for a complete remodel.
How long will it take me to have my kitchen cabinets installed?
It generally takes a few days to install your cabinets, though this can vary depending on the size of your kitchen.
Can I stay at home during a kitchen remodel?
Yes, but you need to be ready for dust, noise, limited access to your kitchen, and sometimes even a lack of water and power.
Should countertops or cabinets come first?
The cabinets come first; then you install the countertops after the cabinets are installed.
How can I prevent delays during my kitchen remodel?
By planning everything well before you start construction.
Free in-home estimate
Get a Real Quote From a Real Cabinet Specialist
The best way to understand your project is to see the space in person. We visit your home, take measurements, review your ideas, and provide a clear estimate.